| Bidang | AN |
|---|---|
| No Surat | TU.00/SP-771/PW15/1/2026 |
| Tanggal | 06-08-2026 |
| Tujuan Instansi | Dewan Pengawas Perumdam Danum Pomolum Kabupaten Murung Raya |
| Kota Tujuan | Puruk Cahu |
| No Laporan | PE.09.03/LHP-278/PW15/4/2026 |
|---|---|
| Tanggal | 31-07-2026 |
| No SP | PE.09.03/SP-1583/PW15/4/2026 |
| Tgl SP | 31-07-2026 |
| Jumlah | 1 |
| Tgl Terima Bidang | 10-08-2026 |
|---|---|
| Ekspedisi | Pos Indonesia |
| Tgl Kirim | 10-08-2026 |
| No Resi | P2608100169756 |
| Keterangan | - |
| Status | Dikirim |
| Nama | - |
|---|---|
| Jabatan | - |
| Tgl Terima | - |
Lokasi belum tersedia